|
| |
Bathroom
#1 - Before Renovations
Bathroom #1 - After Renovations
The above Bathroom Renovation
included the following services delivered by MacCallum Contracting;
Complete tear down and rubbish
removal of original bathroom. (Bathroom was stripped down completely to the framing
of the house.)
Framing, Drywalling, Taping and
painting of all walls and ceiling.
Sourced and installed custom made
cabinets.
Installation of Shower, including
plumbing and tiling
Electrical for all overhead
lighting (pot Lights)
All Plumbing (Toilet, Cast Iron
Tub and Fixtures, Shower, Sink etc.)
Installation of Ceramic tile Floor
(Including a Concrete sub floor for leveling)
|